Engineering Case
180MW POWER GENERATION PUPING TOWN ANLONG COUNTY
Release Date: April 19,2021
Aluminum alloy component frame
Our company currently has 5 fully automatic frame production lines, 2 semi-automatic frame production lines, the automatic line is expected to have a monthly production capacity of 1.2 million sets, and the manual line is expected to have a monthly production capacity of 600,000 sets. We will continue to add 3 automatic frame production lines in the future, which is expected to be realized. Monthly production capacity: 2.52 million sets of aluminum alloy frames, achieving an annual production of more than 27 million sets of aluminum alloy frames.
ADDRESS
No.6 Heping Road, Zhouwangmiao Town, Haining, Jiaxing City, Zhejiang Province
CALL US
0086-57387967160
hncdkj_danwu@hncdkj.net
FAX
0573-87971598
ZIP CODE
314407
Get In Touch
Copyright © 2021 Zhejiang Chuanda New Energy Co., Ltd. 浙ICP備2021012379號